Which project delivery method allows the owner to engage the architect, contractor, and key consultants in a single collaborative contract?
Correct Answer: D Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
On a private project, which of the following actions by a subcontractor who had not been paid by the contractor is most likely to be an effective collection measure?
Correct Answer: A Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
An architect is performing a schematic design quality control review for a new mid-rise office tower.
Which drawings will be included in the architect's review?
Correct Answer: A Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
What type of contract involves payment based on actual costs plus a fee?
Correct Answer: A Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
Construction of a gymnasium is scheduled to be complete 365 days from the date of the notice to proceed. On Friday, day 355 of the schedule, the contractor submits a punch list to the architect for substantial completion.
The architect agrees to review the punch list on-site after the weekend.
On Monday, the architect discovers that a subcontractor left open a skylight over the weekend, allowing heavy rain to fall into the courtyard area and damage the gymnasium floor. It was determined the flooring must be replaced. The lead time for new flooring is 8-10 weeks, and installation will take 14 days. The architect's agreement with the owner is contracted to end 30 days after substantial completion.
Which of the following documents must the architect prepare immediately? Check the two that apply.
Correct Answer: C,D Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
An architect is working on a design-build project for a large skyscraper. The architect has completed a conceptual design, finalized the contracts, and hired consultants. The schematic design phase is set to begin in one week.
Which items or tasks are important for the architect to complete during this time? Check the three that apply.
Correct Answer: A,E,F Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
The main goals on a large project are ease of communication and commitment from the project team.
Which scheduling technique should be used?
Correct Answer: A Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
An architect is working on a large renovation project with an AIA B101 contract. The owner decides to contract separately with an electrical engineer and a security firm. The security firm asks the engineer and architect to coordinate the details for a new card reader access control system.
What is the first step the architect should take?
Correct Answer: C Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).