[Q34-Q58] Verified C_P2W22_2504 dumps Q&As - Pass Guarantee or Full Refund [Mar-2026]

Share

Verified C_P2W22_2504 dumps Q&As - Pass Guarantee or Full Refund [Mar-2026]

C_P2W22_2504 PDF Dumps | Mar 31, 2026 Recently Updated Questions 

NEW QUESTION # 34
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Planning strategy
  • B. Requirements type
  • C. Order type
  • D. Requirements profile

Answer: A,B


NEW QUESTION # 35
When does the system trigger replenishment for a Kanban container?

  • A. When you set the container to Waiting
  • B. When you set the container to Empty
  • C. When you set the container to Full
  • D. When you set the container to In transit

Answer: B


NEW QUESTION # 36
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do?
Note: There are 2 correct answers to this question.

  • A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  • B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • C. Add the agreement to the source list and mark it for MRP relevance.
  • D. Add the agreement to the quota arrangement and mark it for MRP relevance.

Answer: B,C


NEW QUESTION # 37
How would you define a pegging structure for an order in the context of Advanced Planning?

  • A. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
  • B. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
  • C. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
  • D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements

Answer: D


NEW QUESTION # 38
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.

  • A. Planning mode > Bucket
  • B. Scheduling control > Close gap
  • C. Planning mode > Order priority
  • D. Scheduling control > Find slot

Answer: A,D


NEW QUESTION # 39
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?

  • A. Process order management
  • B. Engineering change management
  • C. Batch management
  • D. Quality management

Answer: C


NEW QUESTION # 40
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.

  • A. Change number
  • B. Date
  • C. Lot size
  • D. Material BOM usage

Answer: B,C


NEW QUESTION # 41
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.

  • A. Float before production
  • B. Queue time
  • C. Transit time
  • D. Setup time
  • E. Load time

Answer: A,B,D


NEW QUESTION # 42
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. A sales order is delivered.
  • B. MRP creates a planned order.
  • C. MRP creates a dependent requirement.
  • D. A sales order is created.

Answer: D


NEW QUESTION # 43
What are some options for creating a production order?
Note: There are 2 correct answers to this question.

  • A. By setting a Kanban container to empty
  • B. By converting a purchase requisition
  • C. By setting a Kanban container to full
  • D. By partially converting a planned order

Answer: A,D


NEW QUESTION # 44
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.

  • A. To determine the sequence in which materials are planned in MRP
  • B. To determine the use of subitems inside the material BOM (bill of material)
  • C. To determine the lowest explosion level at which a material occurs in all the product structures
  • D. To determine the priority of alternative components inside the material BOM (bill of material)

Answer: A,C


NEW QUESTION # 45
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.

  • A. Planned orders (unfirmed)
  • B. Production orders
  • C. Planned orders (firmed)
  • D. ATP quantities

Answer: B,C


NEW QUESTION # 46
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

  • A. Assign the overall profile to the authorization profile
  • B. Create an object selection variant for production-planning-related alerts
  • C. Create an object selection variant for alerts according to the priority of ATP categories
  • D. Assign the alert profile to the overall profile

Answer: B,D


NEW QUESTION # 47
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.

  • A. To enable simple structuring of BOMs
  • B. To make the assignment of components easier
  • C. To reduce the number of material masters
  • D. To make the procurement easier

Answer: A,B


NEW QUESTION # 48
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?

  • A. Specify a negative PP/DS horizon
  • B. Specify a negative opening period
  • C. Specify a negative offset time
  • D. Specify a negative planning horizon

Answer: C


NEW QUESTION # 49
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.

  • A. Convert a purchase requisition
  • B. Create by order release
  • C. Create in Kanban process
  • D. Create without material

Answer: C,D


NEW QUESTION # 50
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.

  • A. Past quotation quantities
  • B. Past production planning quantities
  • C. Past sales order quantities
  • D. One-off events
  • E. Market intelligence

Answer: C,D,E


NEW QUESTION # 51
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.

  • A. By mass processing
  • B. By order confirmation
  • C. By capacity planning
  • D. By order release

Answer: A,D


NEW QUESTION # 52
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.

  • A. Material
  • B. Work center
  • C. Plant
  • D. Production version

Answer: A,B


NEW QUESTION # 53
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?

  • A. Assembly processing with production orders (82)
  • B. Planning with final assembly (40)
  • C. Production by lot size (30)
  • D. Planning at assembly level (70)

Answer: D


NEW QUESTION # 54
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.

  • A. Routings
  • B. Production order
  • C. Work center
  • D. Bill of material

Answer: A,D


NEW QUESTION # 55
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.

  • A. Use the material number for selection
  • B. Use a different MRP planner for PP/DS materials
  • C. Use a propagation range
  • D. Use the special MRP type XO

Answer: B,D


NEW QUESTION # 56
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
  • B. The lot size range must be within the lot size range of the assigned routing.
  • C. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
  • D. The assigned routing and bill of material (BOM) must have the same validity period.
  • E. The consistency check must be performed.

Answer: B,C,E


NEW QUESTION # 57
When do you use variant bills of material (BOMs)?

  • A. When a material has a configurable BOM
  • B. When a material has multiple BOMs
  • C. When multiple materials have multiple BOMS
  • D. When multiple materials have similar BOMS

Answer: D


NEW QUESTION # 58
......

C_P2W22_2504 Exam Questions – Valid C_P2W22_2504 Dumps Pdf: https://www.passtestking.com/SAP/C_P2W22_2504-practice-exam-dumps.html