
Verified C_P2W22_2504 dumps Q&As - Pass Guarantee or Full Refund [Mar-2026]
C_P2W22_2504 PDF Dumps | Mar 31, 2026 Recently Updated Questions
NEW QUESTION # 34
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Planning strategy
- B. Requirements type
- C. Order type
- D. Requirements profile
Answer: A,B
NEW QUESTION # 35
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Waiting
- B. When you set the container to Empty
- C. When you set the container to Full
- D. When you set the container to In transit
Answer: B
NEW QUESTION # 36
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do?
Note: There are 2 correct answers to this question.
- A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- C. Add the agreement to the source list and mark it for MRP relevance.
- D. Add the agreement to the quota arrangement and mark it for MRP relevance.
Answer: B,C
NEW QUESTION # 37
How would you define a pegging structure for an order in the context of Advanced Planning?
- A. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
- B. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
- C. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements
Answer: D
NEW QUESTION # 38
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Planning mode > Bucket
- B. Scheduling control > Close gap
- C. Planning mode > Order priority
- D. Scheduling control > Find slot
Answer: A,D
NEW QUESTION # 39
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Process order management
- B. Engineering change management
- C. Batch management
- D. Quality management
Answer: C
NEW QUESTION # 40
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Date
- C. Lot size
- D. Material BOM usage
Answer: B,C
NEW QUESTION # 41
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Float before production
- B. Queue time
- C. Transit time
- D. Setup time
- E. Load time
Answer: A,B,D
NEW QUESTION # 42
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. A sales order is delivered.
- B. MRP creates a planned order.
- C. MRP creates a dependent requirement.
- D. A sales order is created.
Answer: D
NEW QUESTION # 43
What are some options for creating a production order?
Note: There are 2 correct answers to this question.
- A. By setting a Kanban container to empty
- B. By converting a purchase requisition
- C. By setting a Kanban container to full
- D. By partially converting a planned order
Answer: A,D
NEW QUESTION # 44
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the sequence in which materials are planned in MRP
- B. To determine the use of subitems inside the material BOM (bill of material)
- C. To determine the lowest explosion level at which a material occurs in all the product structures
- D. To determine the priority of alternative components inside the material BOM (bill of material)
Answer: A,C
NEW QUESTION # 45
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (unfirmed)
- B. Production orders
- C. Planned orders (firmed)
- D. ATP quantities
Answer: B,C
NEW QUESTION # 46
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the overall profile to the authorization profile
- B. Create an object selection variant for production-planning-related alerts
- C. Create an object selection variant for alerts according to the priority of ATP categories
- D. Assign the alert profile to the overall profile
Answer: B,D
NEW QUESTION # 47
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To enable simple structuring of BOMs
- B. To make the assignment of components easier
- C. To reduce the number of material masters
- D. To make the procurement easier
Answer: A,B
NEW QUESTION # 48
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative PP/DS horizon
- B. Specify a negative opening period
- C. Specify a negative offset time
- D. Specify a negative planning horizon
Answer: C
NEW QUESTION # 49
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create by order release
- C. Create in Kanban process
- D. Create without material
Answer: C,D
NEW QUESTION # 50
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. Past production planning quantities
- C. Past sales order quantities
- D. One-off events
- E. Market intelligence
Answer: C,D,E
NEW QUESTION # 51
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.
- A. By mass processing
- B. By order confirmation
- C. By capacity planning
- D. By order release
Answer: A,D
NEW QUESTION # 52
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Material
- B. Work center
- C. Plant
- D. Production version
Answer: A,B
NEW QUESTION # 53
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?
- A. Assembly processing with production orders (82)
- B. Planning with final assembly (40)
- C. Production by lot size (30)
- D. Planning at assembly level (70)
Answer: D
NEW QUESTION # 54
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Routings
- B. Production order
- C. Work center
- D. Bill of material
Answer: A,D
NEW QUESTION # 55
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the material number for selection
- B. Use a different MRP planner for PP/DS materials
- C. Use a propagation range
- D. Use the special MRP type XO
Answer: B,D
NEW QUESTION # 56
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- B. The lot size range must be within the lot size range of the assigned routing.
- C. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- D. The assigned routing and bill of material (BOM) must have the same validity period.
- E. The consistency check must be performed.
Answer: B,C,E
NEW QUESTION # 57
When do you use variant bills of material (BOMs)?
- A. When a material has a configurable BOM
- B. When a material has multiple BOMs
- C. When multiple materials have multiple BOMS
- D. When multiple materials have similar BOMS
Answer: D
NEW QUESTION # 58
......
C_P2W22_2504 Exam Questions – Valid C_P2W22_2504 Dumps Pdf: https://www.passtestking.com/SAP/C_P2W22_2504-practice-exam-dumps.html