NEW QUESTION 45
Total cost of ownership of a solar panel is $5,000 and it is expected that the panel will make a sav-ing of $1,000 each year. So it would take 5 years for the benefits to repay the investment. Therefore, the firm plans to keep the solar panel for at least 5 years. Is payback period calculation right for making the business decision?
- A. Yes, because it takes everything into account
- B. Yes, because payback period shows how long the firm recovers the investment
- C. No, because payback period can be only used to calculate the depreciation of a fixed asset
- D. No, because payback period doesn't take into account price fluctuations
Answer: B
Explanation:
There are many factors that need to be considered when making a business decision. Costs and benefits are among those factor. To estimate the length of time in which an investment reaches a break-even point, businesses often use the payback period. The payback period refers to the amount of time it takes to recover the cost of an investment.
'Yes, because it takes everything into account': It ignores the time value of money (TVM), unlike other methods of capital budgeting such as net present value (NPV), internal rate of return (IRR), and discounted cash flow.
'No, because payback period doesn't take into account price fluctuations': Though it doesn't take into account price fluctuation, payback period is still useful in financial and capital budgeting.
'No, because payback period can be only used to calculate the depreciation of a fixed asset': Payback period only calculates the length of time in which the benefits of a charge repay its costs.
LO 1, AC 1.3
NEW QUESTION 46
A procurement team is categorising their purchased items into four quadrants of Kraljic's supply chain portfolio matrix. They realise that there are some low-value items which come from very few suppliers in the market. The organisation is critically dependent on these suppliers. The team plans to reduce the dependence by finding alternative sources. Is this a right course of action?
- A. Yes, this action will dramatically increase the supplier's bargaining power
- B. No, the organisation should run competitive biddings to exploit the competition
- C. No, there is no way to escape this dependency
- D. Yes, the organisation needs to reduce the supply risks
Answer: D
Explanation:
According to Kraljic portfolio matrix, the low-value items with high supply risk are bottleneck items.
The purchasing strategy that is commonly recommended for these products is primarily based on acceptance of the dependence and reduction of the negative effects of the unfavourable position. An alternative strategy suggested by purchasing practitioners is to find other suppliers and move towards the non-critical quadrant.
- Accept dependence, reduce negative consequences: The main focus of this strategy is to assure supply, if necessary even at additional cost. Examples of this strategy are keeping extra stocks of the materials concerned or developing consigned stock agreements with suppliers. By performing a risk analysis firms can identify the most important bottleneck products and consider the implications. A possible action for dealing with unexpected bad dependence positions for certain products is to employ contingency planning.
- Reduce dependence and risk, find other solutions: This strategy is geared towards reducing the dependence on the supplier. The most common way to achieve this is to broaden the specifications of the product or to search for new suppliers.
The procurement team in the scenario has selected reducing dependency by finding alternatives. This is a right strategy for bottleneck item.
Reference:
- CIPS study guide page 82-84
- Purchasing strategies in the Kraljic matrix-A power and dependence perspective, Marjolein C.J. Caniels, Cees J. Gelderman LO 2, AC 2.1
NEW QUESTION 47
Datong is a defence and law enforcement equipment supplier. They are developing new product but largely concerns about the detailed specifications of components and the capability of supply market. Which of the following approach should Datong adopt in order to optimise the specification and shorten time to market?
- A. Invite the supplier to tendering process
- B. Early supplier involvement
- C. Control the budget tightly
- D. Request for quotation from potential suppliers
Answer: B
Explanation:
To improve production process and reduce supply risk, Datong should collaborate with suppliers early in procurement cycle. Collaborating with suppliers in this way is often referred as Early Supplier Involvement (ESI)
'Request for quotation from potential suppliers': Quotations should only be requested if the buyer know exactly what they need. In this scenario, Datong is not yet sure about the specifications of product's components, request for quotation is not a good idea.
'Mapping out business plan': A business plan, as defined by Entrepreneur, is a "written document describing the nature of the business, the sales and marketing strategy, and the financial back-ground, and containing a projected profit and loss statement." A business plan is not appropriate with improving production process and reducing supply risk.
'Budget controlling': Budget controlling largely concerns with dealing with budget variances. Tighter budget alone cannot lead to improved processes and fewer risks.
LO 3, AC 3.1
NEW QUESTION 48
Interserve is a construction contractor in UK. When receiving a huge and complex project, Inter-serve's procurement manager assesses the risks by quantifying them and recommends other stake-holders to plan mitigating actions. Is the procurement manager's action justified?
- A. Yes, because procurement manager needs to assess the risks to prioritise and mitigate any potential risks
- B. No, because embedding the risk into pricing will decrease the company's competitiveness
- C. Yes, because all the risks should be quantified and eliminated completely before they happen
- D. No, because no risks can be quantified, therefore the procurement manager's action is impossible.
Answer: A
Explanation:
Assessing the risks by quantifying them should be done. Even with qualitative risk assessment, quantifying is still important since risks need to be prioritised.
Risk assessment can be qualitative or quantitative. Perform qualitative and perform quantitative risk analysis are two processes within the project risk management knowledge area, in the planning process group. While qualitative risk analysis should generally be performed on all risks, for all projects, quantitative risk analysis has a more limited use, based on the type of project, the project risks, and the availability of data to use to conduct the quantitative analysis.
Qualitative Risk Analysis
A qualitative risk analysis prioritises the identified project risks using a pre-defined rating scale. Risks will be scored based on their probability or likelihood of occurring and the impact on project objectives should they occur.
Probability/likelihood is commonly ranked on a zero to one scale (for example, .3 equating to a 30% probability of the risk event occurring).
The impact scale is organizationally defined (for example, a one to five scale, with five being the highest impact on project objectives - such as budget, schedule, or quality).
A qualitative risk analysis will also include the appropriate categorization of the risks, either source-based or effect-based.
Quantitative Risk Analysis
A quantitative risk analysis is a further analysis of the highest priority risks during a which a numerical or quantitative rating is assigned in order to develop a probabilistic analysis of the project.
A quantitative analysis:
- Quantifies the possible outcomes for the project and assesses the probability of achieving specific project objectives
- Provides a quantitative approach to making decisions when there is uncertainty
- Creates realistic and achievable cost, schedule or scope targets
In order to conduct a quantitative risk analysis, you will need high-quality data, a well-developed project model, and a prioritized lists of project risks (usually from performing a qualitative risk analysis).
Reference:
LO 3, AC 3.3
NEW QUESTION 49
Which of the following is a challenge of making a business case for straight re-buys?
- A. Identifying suitable suppliers
- B. Effective inventory control
- C. Terms and conditions
- D. Research of procurement process
Answer: B
Explanation:
For straight re-buy, the specifications for the products are known. Generally, there will be an existing contract with supplier in place. The business need is challenged annually, only on the annual demand. So effective inventory control will help procurement successfully manage straight re-buy.
Reference:
LO 1, AC 1.1
NEW QUESTION 50
Which of the following is the process for improving the value of a new product or service?
- A. Value analysis
- B. Planning and design
- C. Porter's Five Forces
- D. Value engineering
Answer: D
Explanation:
Value Engineering (VE) is concerned with new products. It is applied during product development. The focus is on reducing costs, improving function or both, by way of teamwork-based product evaluation and analysis. This takes place before any capital is invested in tooling, plant or equipment.
This is very significant, because according to many reports, up to 80% of a product's costs (throughout the rest of its life-cycle), are locked in at the design development stage. This is under-standable when you consider the design of any product determines many factors, such as tooling, plant and equipment, labour and skills, training costs, materials, shipping, installation, maintenance, as well as decommissioning and recycle costs.
Reference:
LO 3, AC 3.4
NEW QUESTION 51
Which of the following specific markets is most likely to have product shortage by nature?
- A. Agriculture
- B. Services
- C. Retail
- D. Financial
- E. Construction
Answer: A
Explanation:
Products used in agriculture can be subject to shortage due to natural disasters.
Reference:
LO 2, AC 2.1
NEW QUESTION 52
Which type of specification is less time-consuming to develop?
- A. Design specification
- B. Technical drawings
- C. Conformance specification
- D. Outcome-based specification
Answer: D
Explanation:
There are two major types of specification: conformance and performance specifications. They have the following characteristics:
Since performance specification is often a list of outputs or outcomes, it usually takes less time to develop than conformance specification.
NEW QUESTION 53
Aldar Properties is a property developer in UAE. In last month, it spent $2,160 for 10 tons of steel. In this month, it had planned 10% increment in budget for steel comparing to last month. But the number of orders boosted and total spend on steel reached $1,992.1 while Aldar has imported 11 tons. What is the main cost driver of steel budget?
- A. Price variance
- B. Both price and quantity variances
- C. Inflation
- D. Quantity variance
Answer: A
Explanation:
In this question, you have to calculate price variance and quantity variance.
Last month, 1 tonne of steel costed $216. This month, the price decreases to $181.1. Price variance = (P1 - P2)*Q2 = ($216-$181.1)*11 = $383.9 Quantity variance = (Q1-Q2)*P1 = -$216 Price variance is greater than quantity variance, therefore, price variance is the main cost driver.
LO 1, AC 1.4
NEW QUESTION 54
Which of the following agencies can produce a technical standard?
- A. House of Lords
- B. BSI
- C. Marketing department
- D. Department of State
Answer: B
Explanation:
Technical standards are often produced by a national or international body such as British Standard Institute (BSI) LO 3, AC 3.1
NEW QUESTION 55
Which of the following factors are likely to be direct barriers to a new entrant in a supply market?
- A. Threat of forward integration
- B. Availability of substitutes
- C. Brand identity
- D. Value to price
- E. Cost advantages
Answer: C,E
Explanation:
There are many types of barriers to entry into a market. Some of these include:
- Economies of Scale: When manufacturing or selling at a large scale, companies are able to avail cost advantages because per unit costs of the product fall. So the more the company produces in quantity the more the benefit. When existing companies have this advantage, it can act as a barrier to entry because a new entrant will have to try to match the scale to achieve the same cost ad-vantage as the existing company. This may not be possible at the initial stage.
- A Differentiated Product: If the product being sold by the existing company or companies is highly differentiated or enjoys strong brand loyalty, then this can act as a strong barrier to entry. The new entrant will have to invest in creating a product with newer and unique features and bene-fits that surpass those offered by the old company. In addition, there will need to be strong efforts to break existing brand loyalties and shift them to a new untested company.
- High Capital Costs: If an industry requires huge capital investments at the onset, then this will act as a barrier to entry for many of the potential entrants. Only those will attempt to enter the competitive fray who have the resources to make this high initial investment.
- Other Cost Advantages: Apart from those cost benefits that come from economies of scale, there are other advantages that an existing firm may enjoy. These include access to the best suppliers, an understanding of existing materials and knowledge of their quality, possession of any necessary and important patents, and proprietary information and technological knowledge. There are also learning advantages, achieved over years of business and experience.
- Cost of Switching: The cost associated with a consumer's move from one company or product or another is called the switching cost. If there are significant switching costs, then a new entrant may not be able to create means of removing these. Or, they may have to offer significant advantage to counter these switching costs at their own expense.
- Distribution Network: Often, distribution relationships are well established and may prove to be a strong barrier to entry for a new company. A new entrant will obviously need access to these dis-tribution channels but will need to invest extra in order to engage distributors who have established relations with existing competitors.
- Suppliers: As with distributors, suppliers may be vital to the operations of a new business. Exist-ing suppliers may have contracts or loyalties with existing companies and may prove to be difficult to form relationships with.
- Legal and Government Created Barriers: Government and regulatory requirements such as permits and licenses may be a strong barrier to entry. There may also be laws governing ways to conduct business that may conflict with a company's practices in other countries.
- Barriers to Exit: Interestingly, barriers to exit may act as a deterrent to entry by new companies. If a company is unable to easily leave a competitive environment in case business does not work out, then it will have to stay and compete even if that is a detrimental business practice. In this case, the company may choose to not enter the market in the first place.
Reference:
LO 2, AC 2.2
NEW QUESTION 56
Which of the following is the disadvantage of embedding standards in a specification?
- A. Standards are too static and discourage innovation
- B. Standards do not improving buyer's bargaining power
- C. Embedding standards into specification requires enormous time and effort
- D. Standards are too flexible and may cause ambiguity in the specification
Answer: A
Explanation:
"Standards are often produced by professional bodies (maybe national or international bodies). Standards tend to be stable for a period of time, therefore, they are likely to be static and discourage innovation." Reference:
LO 3, AC 3.1
NEW QUESTION 57
Which of the following are typical social considerations throughout the contract life cycle? Select the TWO that apply.
- A. Health and safety
- B. Using recycled materials
- C. Support small local businesses
- D. Minimizing use of non-renewable resources
- E. Managing waste
Answer: A,C
Explanation:
The following are typical social criteria in procurement:
* Reducing unemployment
* Preventing the use of child labour
* Preventing discrimination on the grounds of race, religion, disability, sex or sexual orientation
* Encouraging good employment practice
* Reducing local unemployment
* Reducing social exclusion
* Promoting training opportunities for the young or disadvantaged
* Encouraging access to work for people with disabilities
Reference:
LO 3, AC 3.2
NEW QUESTION 58
GSC Ltd is a manufacturer of car parts. To accommodate growing demands of electric cars, the company is developing a new component which requires different type of steel. The project team estimates that the component will be ready for production in 1.5 years. Until then, they need to keep the production busy.
After checking the inventory records, the production team sees that the company has 3 months of stock. The lead time for each batch is two months. Which of the following should be a priority ac-tion of the company?
- A. Make a call-off order to current supplier
- B. Create new specification to current supplier
- C. Create new specification to new supplier
- D. Standardise the specification
Answer: A
Explanation:
The scenario is very long with many distracting data. Students need to read carefully and use their experience to solve this problem.
The company is developing a new component which requires different type of material. But this component will not be available for mass production in 1.5 years. This means the company still needs to produce the current components with current materials until the development is finished. They must continue purchase the materials from current supplier through call-off orders. This situation is an example of straight re-buy.
Reference:
LO 1, AC 1.1
NEW QUESTION 59
Apple's CPO is planning a budget for purchasing carbon-free aluminium next year. There are 27.4 tonnes of aluminum in stock, while Apple will need 200 tonnes for production next year and double inventory for production in the following year. How much aluminum will Apple need to purchase in next year?
- A. 227.4 tonnes
- B. 172.6 tonnes
- C. 117.8 tonnes
- D. 282.2 tonnes
Answer: A
Explanation:
The quantity of aluminium Apple needs to buy is calculated as follows:
Quantity needed for production + the inventory needed at the end of the year - inventory at start of the year That formula is quantified as: 200 + 54.8 - 27.4 = 227.4 Reference:
LO 2, AC 2.3
NEW QUESTION 60
A procurement manager is writing a conformance specification for a non-core component. She thinks that if the requirements in specification are higher than ISO standards, her company can achieve greater cost-savings. Is the procurement manager's opinion correct?
- A. Yes, because optimising the specification is the only method to achieve value for money
- B. No, because higher requirements in specification, the greater bargaining power of buying organisation
- C. Yes, because higher requirements will help buying organisation find the best supplier
- D. No, because higher specification may incur additional costs for the buyer
Answer: D
Explanation:
The specification that is produced too detailed will incur unnecessary cost because it does not allow suppliers to use their expertise in finding the most efficient way to produce it.
'No, because higher requirements in specification, the greater bargaining power of buying organi-sation': more detailed specifications could tighten the supplier base and potentially leave buying organisation with fewer potential supplier. This may reduce buyer's bargaining power in negotia-tion.
'Yes, because higher requirements will help buying organisation find the best supplier': in some circumstances, higher requirements will lead to smaller supplier base. In the worst scenario, there is no supplier who has capability to carry out those requirements
'Yes, because optimising the specification is the only method to achieve value for money': There are other methods to achieve cost saving and value for money, inter alia, volume concentration, relationship restructuring, etc.
Reference:
LO 3, AC 3.1
NEW QUESTION 61
A procurement manager is discussing with other stakeholders about the scope and the implementation of the upcoming construction project. A stakeholder argues that the construction projects are often risky as the overall scope of the work can't be accurately estimated from the beginning. Furthermore, the project spans over a long period, the costs of materials can fluctuate widely. The procurement manager suggests that the pricing structure should be able to cover the supplier's costs plus 10% markup on total costs. This arrangement is known as...?
- A. Cost-plus fixed-fee
- B. Cost-plus award fee
- C. Cost-plus Fixed percentage
- D. Cost-plus incentive fee contracts
Answer: C
Explanation:
As you can see from the scenario, the procurement manager is suggesting to use cost plus pricing arrangement.
A cost-plus contract is an agreement to reimburse a company for expenses incurred plus a specific amount of profit, usually stated as a percentage of the contract's full price. These type of contracts are primarily used in construction where the buyer assumes some of the risk but also provides a degree of flexibility to the contractor.
Cost-plus contracts can be separated into four categories. They each allow for the reimbursement of costs as well as an additional amount for profit:
1. Cost-plus award fee contracts allow the contractor to be awarded a fee usually for good per-formance.
2. Cost-plus fixed-fee contracts cover both direct and indirect costs, in addition to a fixed fee.
3. Cost-plus incentive fee contracts happen when the contractor is given a fee if his or her perfor-mance meets or exceeds expectations.
4. Cost-plus percent-of-cost contracts allow the amount of reimbursement to rise if the contrac-tor's costs rise.
In the scenario, the procurement manager suggests a pricing structure that covers supplier's costs and adds 10% markup. This is cost-plus fixed-percentage.
Reference:
- Cost-Plus Contract Definition (investopedia.com)
- CIPS study guide page 30-36
LO 1, AC 1.2
NEW QUESTION 62
Which of the following provides in-depth detail for both functional and non-functional require-ments and covers assumptions, constraints, performance, dimensions, weights and reliability of a product?
- A. Performance specification
- B. Design specification
- C. Tolerance
- D. Statement of work
Answer: B
Explanation:
Design specification is a detailed document providing a list of points regarding a product or pro-cess. For example, the design specification could include required dimensions, environmental fac-tors, ergonomic factors, aesthetic factors, maintenance that will be needed, etc. It may also give specific examples of how the design should be executed, helping others work properly (a guideline for what the person should do).
Performance specification is written requirement that describes the functional performance criteria required for a particular equipment, material, or product.
Tolerance is the permissable limit of a variable used to define a product Statement of work is the document that captures and defines all aspects of a project, including the activities, deliverables and the timetable for the project.
Reference:
LO 3, AC 3.1
NEW QUESTION 63
Which of the following is a tool to define roles and responsibilities of a project team?
- A. Monte Carlo model
- B. STEEPLE Analysis
- C. SCAMPER Method
- D. RACI Matrix
Answer: D
Explanation:
A responsibility assignment matrix[1] (RAM), also known as RACI matrix[2] (/relsi/) or linear responsibility chart[3] (LRC), describes the participation by various roles in complet-ing tasks or deliverables for a project or business process. RACI is an acronym derived from the four key responsibilities most typically used: responsible, accountable, consulted, and informed.[4] It is used for clarifying and defining roles and responsibilities in cross-functional or departmental projects and processes.[5] There are a number of alternatives to the RACI model.
Role distinction[edit]
There is a distinction between a role and individually identified people: a role is a descriptor of an associated set of tasks; may be performed by many people; and one person can perform many roles. For example, an organization may have ten people who can perform the role of project manager, although traditionally each project only has one project manager at any one time; and a person who is able to perform the role of project manager may also be able to perform the role of business analyst and tester.
R = Responsible (also recommender)Those who do the work to complete the task.[6] There is at least one role with a participation type of responsible, although others can be delegated to assist in the work required (see also RASCI below for separately identifying those who participate in a sup-porting role).
A = Accountable (also approver or final approving authority)The one ultimately answerable for the correct and thorough completion of the deliverable or task, the one who ensures the prerequi-sites of the task are met and who delegates the work to those responsible.[6] In other words, an accountable must sign off (approve) work that responsible provides. There must be only one accountable specified for each task or deliverable.[7] C = Consulted (sometimes consultant or counsel)Those whose opinions are sought, typical-ly subject-matter experts; and with whom there is two-way communication.[6] I = Informed (also informee)Those who are kept up-to-date on progress, often only on completion of the task or deliverable; and with whom there is just one-way communication.[6] Very often the role that is accountable for a task or deliverable may also be responsible for com-pleting it (indicated on the matrix by the task or deliverable having a role accountable for it, but no role responsible for its completion, i.e. it is implied). Outside of this exception, it is generally recommended that each role in the project or process for each task receive, at most, just one of the participation types. Where more than one participation type is shown, this generally implies that participation has not yet been fully resolved, which can impede the value of this technique in clarifying the participation of each role on each task.
Reference:
- CIPS study guide page 17
- Responsibility assignment matrix - Wikipedia
LO 1, AC 1.1
NEW QUESTION 64
A procurement manager includes provision on recovery from natural disaster into a through-life specification. Some suppliers suppose that provision is unnecessary. Is procurement manager's action justified?
- A. Yes, because the regulations require contract to have recovery provision
- B. Yes, because natural disaster may cause risks in organisation's supply chain
- C. No, because with current technology, natural disaster can't disrupt supply chain.
- D. No, because this provision will incur unnecessary cost to supplier
Answer: B
Explanation:
Risks like natural disasters - fire, flood, or weather-related event, and cyber-attacks can disrupt the supply chain seriously. Threats and disruptions mean a loss of revenue and higher costs, which leads to a drop in profitability. And businesses can't rely on insurance alone because it doesn't cover all the costs and the customers who move to the competition. Risks must be identified early and supplier should have a plan that ensures continuous operations during disasters.
There are several steps many companies must follow to develop a solid business continuity plan. They include:
- Business Impact Analysis: Here, the business will identify functions and related resources that are time-sensitive. (More on this below.)
- Recovery: In this portion, the business must identify and implement steps to recover critical business functions.
- Organization: A continuity team must be created. This team will devise a plan to manage the disruption.
- Training: The continuity team must be trained and tested. Members of the team should also complete exercises that go over the plan and strategies.
Reference:
LO 3, AC 3.2
NEW QUESTION 65
Sabic is a petrochemical manufacturer. It wants to digitalise its operation and is looking for new IT system. The procurement manager approaches this matter with a through-life specification. He supposes that stating "good quality" in the specification will be enough for quality standard section. Is the procurement manager's thought appropriate?
- A. No, because "good quality" is very ambiguous for suppliers to identify Sabic's re-quirement
- B. Yes, because the specification should be concise.
- C. Yes, because IT sector has its own standard of quality, therefore, suppliers may deliver good quality without any further Explanation:
- D. No, because "good quality" is an in-house jargon that suppliers are not familiar with
Answer: A
Explanation:
Specifications for through-life contracts must be clear. They should use precise technical language and avoid any ambiguity as much as possible. In most cases, 'good quality' is ambiguous. The con-tractor doesn't know exactly which product the buying organisation needs and how to supply that product.
Other notices for description of requirement are:
- Short and simply description
- Clear definitions at the beginning of the documents
- Clarify abbreviations (if any), but abbreviations should be avoided as much as possible
- Avoid any 'slang'
- Use imperative forms of language whenever possible.
LO 3, AC 3.2
NEW QUESTION 66
......
A fully updated 2023 L4M2 Exam Dumps exam guide from training expert PassTestking: https://www.passtestking.com/CIPS/L4M2-practice-exam-dumps.html
Practice To L4M2 - PassTestking Remarkable Practice On your Defining Business Needs Exam: https://drive.google.com/open?id=18XVhk9giO52l7oNnfO1hlGe3zH0_Zmiz