NABCEP PV Installation Professional (PVIP) Board Certification - PVIP Exam Practice Test
An installer is sizing conductors for a 200-foot PV source circuit with a current of 8A at 400V DC. The design specifies a 1.5% voltage drop using copper wire at 30°C. What is the minimum wire size required?
Correct Answer: A
Vote an answer
A module's power drops by 0.5%/year. After 10 years, what is the output if the original power is 320W?
Correct Answer: B
Vote an answer
Which electrical connection requires the use of a torque device to complete the connection per NEC requirements?
Correct Answer: A
Vote an answer
According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?
Correct Answer: B
Vote an answer
A system commissioning test requires verifying rapid shutdown functionality. What is the maximum time allowed for voltage to drop below 30V per NEC 690.12?
Correct Answer: C
Vote an answer
A 7KW/ 14 KWh multimode system has been installed at a residence, ac-couple with the customer's existing
6.7kwh ac PV system. The system providers uninterrupted power to a protect loads subpanel, which is connected to a refrigerator, Microwave, 1.0 ton are conditioner, three lightning circuit, and the 6.7kwac PV system. One month later, the homeowner moves additional circuits to the protected loads subpanel, substantially increasing the loads. Why would this cause, the backfed interconnection breaker in the main service panel to trip?
6.7kwh ac PV system. The system providers uninterrupted power to a protect loads subpanel, which is connected to a refrigerator, Microwave, 1.0 ton are conditioner, three lightning circuit, and the 6.7kwac PV system. One month later, the homeowner moves additional circuits to the protected loads subpanel, substantially increasing the loads. Why would this cause, the backfed interconnection breaker in the main service panel to trip?
Correct Answer: D
Vote an answer
Inspection of a new PV installation shows that the dwelling uses a galvanized water pipe for its grounding electrode and that the PV system now shares the connection. Which of the following is an acceptable supplemental electrode method to ensure the integrity of having a grounding electrode?
Correct Answer: D
Vote an answer
A site has an average wind speed of 25 mph and is classified as Exposure Category C per ASCE 7. What is the minimum wind design speed for the PV array structure?
Correct Answer: D
Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
Insulation resistance testing is being performed on the conductors of a 3-year-old PV system. With a constant high test voltage being applied to a dc conductor, the test results in a high resistance reading. Which does this finding indicate?
Correct Answer: D
Vote an answer
A metal condult containing an array circuit with Vmo of 400Vdc is connected to a metal enclosure at the location where the concentric knockouts have been punched by the manufacturer. Which method of attachment should be used?
Correct Answer: D
Vote an answer
A PV system is designed with a 48V battery bank and a 5 kW inverter. The load requires 20 kWh/day, and the system must have 2 days of autonomy with a maximum depth of discharge (DoD) of 50%. What is the minimum battery capacity required in Ah?
Correct Answer: D
Vote an answer