Deploying on demand and avoiding over-investment is the only advantage of a modular data center.
Correct Answer: A
Vote an answer
Huawei NetCol5000-A line-level precision air conditioner mainly solves the hot issue of high-density data center.
Correct Answer: A
Vote an answer
In ECO mode, the UPS operates in the () state when the input is stable.
Correct Answer: B
Vote an answer
If the ECC800 is configured with a SIM card, the SIM card should be installed in ().
Correct Answer: D
Vote an answer
When a fire occurs in the cabinet, what is used to activate the gas fire extinguishing device on site?
Correct Answer: B
Vote an answer
In the process of using the battery, in order to reduce the deterioration of the voltage imbalance between the batteries, it is necessary to increase the charging voltage of the battery pack, and to activate and charge the battery to extend the battery life, which is called ().
Correct Answer: D
Vote an answer
When the single machine is working, after the function of power-off of the ups2000-g machine is prohibited, the PL port has no output when overload or battery power is low.
Correct Answer: A
Vote an answer
Unpredictable business, expansion and difficult investment is one of the challenges facing the development of traditional data center business.
Correct Answer: B
Vote an answer
Where is the recommended installation location for the Smart ETH socket?
Correct Answer: A
Vote an answer
Two different versions of the software UPS2000-G can be implemented in parallel.
Correct Answer: B
Vote an answer
In the stable operation of the NeCol5000-A35kW air conditioner compressor, the oil level observed by the oil sight is regarded as qualified at the ( ) position.
Correct Answer: C
Vote an answer
The user can modify the login password in the ( ) menu of the ECC800 web interface.
Correct Answer: C
Vote an answer
The rated capacity of the battery: also called the nominal capacity, according to the national standard or line standard requirements, is the lowest capacity value that should be released.
Correct Answer: A
Vote an answer
When you create a camera in NetEco, you need to get () in addition to the IP address of the camera.
Correct Answer: C