EMC Dell PowerEdge Operate v2 - D-PE-OE-01 Exam Practice Test

A technician is experiencing a compatibility issue that causes network disconnects between the iDRAC firmware and an application that is running.
The iDRAC must be rolled back to the last working version. The Enterprise licensed server cannot be rebooted outside scheduled maintenance windows. The next scheduled window is one month away.
Where should the technician perform the Firmware Rollback?
Correct Answer: A Vote an answer
The system administrator deployed the Dell PowerEdge server. No iDRAC license was purchased with the server.
Which features are available?
Correct Answer: B Vote an answer
A new Dell customer is ordering servers that have very specific firmware dependencies. Any replaced parts of the same type must match the replaced original part identically. The procedure must be as simple as possible with minimal risk.
What action should a technician take to accomplish this goal?
Correct Answer: C Vote an answer
A technician needs to add a device to SupportAssist Enterprise. Policy requires that no additional software be installed on the server OS.
In addition to Username and Password, what information is required to add the device?
Correct Answer: A Vote an answer
What must be done before upgrading OMSA from the 32-bit to the 64-bit version?
Correct Answer: D Vote an answer
A user has a fully configured PowerEdge R640 and an iSM installed on their Windows. 2016 operating system. They now want to install OMSA to enable them to have alerts sent out In-Band to a management console.
What does the user need to consider?
Correct Answer: B Vote an answer
A Dell EMC PowerEdge 14G server uses Intel OPTANE DC Persistent Memory in Memory mode.
What is the minimum size DIMM supported for this type of memory?
Correct Answer: D Vote an answer
A user has a drive failure on a server with four identical drives configured in a RAID 5 setup and no spare. The technician arrives and switches the bad drive with an identical new drive and completes a rebuild. A month later the user complains that the RAID configuration is a little slower than it was before the failure.
What action should the technician take?
Correct Answer: C Vote an answer
A company operates a Dell PowerEdge server configured with a RAID 10 virtual disk that hosts critical databases services. Monitoring tools indicate that the virtual disk usage has reached 95% of total capacity.
The server provides 24/7 mission-critical services, so downtime must be minimized or completely avoided.
Currently, the server has only one empty drive bay remaining. What should the operations team consider first to safely plan the expansion of the RAID 10 virtual disk?
Correct Answer: B Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
A system administrator needs to update 100 physical servers.
Which tool could they use to accomplish the task with minimum effort?
Correct Answer: C Vote an answer
A server has two 1100w power supplies. The system needs to enable or disable power supplies dynamically depending on power needs. Power Supply 2 needs to be main power supply.
Which two settings should the technician change?(Choose two.)
Correct Answer: C,E Vote an answer
Refer to the exhibit.

A system administrator wants to monitor information about the system using their smartphone and a Bluetooth connection. LED labeled 3 on the control panel is solid white. What does the LED indicate?
Correct Answer: A Vote an answer
A new Dell customer is ordering servers that have very specific firmware dependencies. Any replaced parts of the same type must match the replaced original part identically. The procedure must be as simple as possible with minimal risk. What action should a technician take to accomplish this goal?
Correct Answer: B Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
A technician needs to update the iDRAC license on a PowerEdge R740 server from Express to Enterprise.
The server has the following components:
- 2x CPUs
- 384 GB RAM
- 6x 1 TB drives
- 1x PSU
The server is powered down but connected to active AC. The user wants it to stay powered down and not connect to any networks. No errors are presently displayed.
How can the technician upgrade the license?
Correct Answer: D Vote an answer