The CM is tasked with analyzing the schedule variance of a project on a regular basis. The contractor's recent payment application includes a dramatic increase in earned hours than what was budgeted for the project. This MOST likely indicates
Correct Answer: C Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
The narrative accompanying a CM-developed construction cost estimate during the design phase should include which of the following?
Correct Answer: D Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
A CM is milling and paving a 2-mile-long bridge with a surface that is in total failure. The owner gave the contractor October 24 as the fixed completion date. Meanwhile, the owner has promised the public that work hours would be 7am-7pm, 5 days per week and that the bridge would be completed by September 1.
The bridge deck is poured on a steel grid deck, but this type of operation has never been performed in the state and complications from weather have slowed progress. The contractor has requested to work nonstop 24/7 to meet the deadline told to the public.
The CM should
Correct Answer: B Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
The contract documents normally require which party/parties to coordinate the transfer of spare parts and warranties to the owner?
Correct Answer: C Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
During the design phase of a project, the owner had requested the design team develop mitigating strategies due to expected budget concerns. During the procurement process, the agency CM should advise the owner consider
Correct Answer: A Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
Which of the following addresses the administrative and reporting requirements for a Construction Manager during execution of a project?
Correct Answer: D Vote an answer
Explanation: Only visible for PassTestking members. You can sign-up / login (it's free).
At what stage of the design phase shall the CM conduct a constructability review?
Correct Answer: C Vote an answer