The maintenance engineer creates a single cycle plan with a cyle of 12 months and enters the scheduling indicator time-key date.
Which further scheduling parameter must you enter so that the calcuated call date is always scheduled six months before the planned date? choose 1 answer
Correct Answer: D Vote an answer
What are the three implementation scenarios covered by SAP Activate?
Correct Answer: A,B,D Vote an answer
What is the function of the print diversion setting?
Correct Answer: A Vote an answer
You create an equipement task list for piece of equipment without BOM assignment. How can you assign component to a task list operation of this equipement taks list? choose 1 answer
Correct Answer: C Vote an answer
What does the structure indicator define? choose 2 answers
Correct Answer: A,C Vote an answer
Which of the following are checking instructions used to control availability checks?
Correct Answer: A,B Vote an answer