BICSI Registered Communications Distribution Designer - RCDD v15 - RCDDv15 Exam Practice Test
Which of the following statements Is CORRECT concerning best practice for horizontal cable management panels?
Correct Answer: D
Vote an answer
DRAG DROP
Identify the core switch(es) and server(s) of the data center in the diagram below by dragging the appropriate term into each box in the diagram.

Identify the core switch(es) and server(s) of the data center in the diagram below by dragging the appropriate term into each box in the diagram.

Correct Answer:

A large automaker begins a program to create the next-generation car. As the program team is composed, key stakeholders are identified Key stakeholders for the program should include which of the following?
Correct Answer: A
Vote an answer
What should be considered when designing a fiber network?
Correct Answer: E
Vote an answer
Which of the following is TRUE for tele communications spaces?
Correct Answer: B
Vote an answer
A program manager for an electronic gaming manufacturer is managing a new virtual reality program. An international trade agreement in the final stages of renegotiation will reduce supply-chain costs and delivery intervals A materials supplier informs the program manager that when this agreement is finalized, it will shorten the products delivery time.
What should the program manager update first?
What should the program manager update first?
Correct Answer: A
Vote an answer
An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review
What should the program manager do next?
What should the program manager do next?
Correct Answer: B
Vote an answer
A small regional utility closes a customer rewards program and transitions it to operations. The executive sponsor and program manager are concerned about the impact on benefits realization. The program manager assures the executive sponsor that any corrective actions will be included in the next phase.
What should the program manager do to ensure a successful transition?
What should the program manager do to ensure a successful transition?
Correct Answer: A
Vote an answer
A hotel chain initiates a program to expand meeting offerings to include telecommunications technology and virtual meetings. The program has component projects, each of which requires team members to have different technical skills and expertise. The program manager assembles a team of project managers to lead each of the projects, and learns that the desired resources will not be available at the start of the program
As a result, the program manager must do which of the following'?
As a result, the program manager must do which of the following'?
Correct Answer: D
Vote an answer
The above performance report shows the earned value (EV) analysis for a program.

The program director performs a high-level analysis and must present a summary narrative to the steering committee.
What do the current findings show?

The program director performs a high-level analysis and must present a summary narrative to the steering committee.
What do the current findings show?
Correct Answer: B
Vote an answer
What is the MINIMUM lighting requirement for telecommunications spaces?
Correct Answer: D
Vote an answer
An ICT distribution designer is representing a client during a project execution.
What is the designer's role in the Vendor and Contractor Coordination?
What is the designer's role in the Vendor and Contractor Coordination?
Correct Answer: D
Vote an answer
The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?
Correct Answer: A
Vote an answer
A program sponsor is concerned about the status of high-priority risks and budget variances.
The program manager should refer lo which of the following?
The program manager should refer lo which of the following?
Correct Answer: A
Vote an answer
Near the completion of a transformation program, the operations manager is concerned that their department failed lo be notified in advance of the new service being transitioned into operations. They claim that their department did not approve this service and is now unprepared and untrained to support the transformation.
What should the program manager have done first to prevent this?
What should the program manager have done first to prevent this?
Correct Answer: A
Vote an answer